iklan ads
Step 1 - Ready Work
Your backyard will demand to be raked extensively before any seeds are sown. This will enable to pinpoint any locations that are in certain need of reseeding, as well as remove the thatch build up and any other surface components. Use a robust broom rake for the first round, covering the complete lawn with even strokes. The ripped teeth of the broom rake will catch leaves, rocks and twigs. After using the broom rake grab a double-duty or multi-use rake to de-thatch the lawn. This elimination will make the simple and patchy spots very visible, allowing you to get the best seed coverage and penetration.
Step 2 - Obtaining the Ground Ready
Now that you can see the bare spots, the soil demands to be loosened and fertilized. Drill down 1 to 6 inches with a cultivator - the more traffic that passes through the place, the deeper you'll need to loosen. For hefty traffic patches mix in peat moss to preserve great drainage. Once the soil has been loosened it's time to add fertilizer. Use a type and amount that suits your soil conditions and the exposure of the lawn. Rake the unfastened and fertilized soil flat.
Step 3 - Time to Distribute the Seed
With a large top quality seed that is made for the problems of your lawn (for shade, sun, slopes, etc.), spread the seed by hand. Coverage should be even but light - too much seed is bad and won't create a fuller lawn. Once the seed is distributed, casually mist the region with your hose.
Step 4 - Protective Coating
For protection and to speed up germination, spread a layer of clear polyethylene plastic sheets on top of the reseeded area. Consider down the sheets with rocks or other small, significant objects around the edge. This protective layer also acts as a humidity retainer, reducing the need to continually water for those first few days.
Step 5 - Seedlings Need Water
When you see the seedlings popping up through the soil get rid of the plastic. Or else, the protection will end up stifling growth. With the sheets off, be positive to lightly mist the soil two or three times per day until the seedlings reach a height of 1 inch. After that weekly watering is required until the grass is 3 inches tall.
Accomplish these five easy steps to appreciate a total, healthful lawn come springtime.
Your backyard will demand to be raked extensively before any seeds are sown. This will enable to pinpoint any locations that are in certain need of reseeding, as well as remove the thatch build up and any other surface components. Use a robust broom rake for the first round, covering the complete lawn with even strokes. The ripped teeth of the broom rake will catch leaves, rocks and twigs. After using the broom rake grab a double-duty or multi-use rake to de-thatch the lawn. This elimination will make the simple and patchy spots very visible, allowing you to get the best seed coverage and penetration.
Step 2 - Obtaining the Ground Ready
Now that you can see the bare spots, the soil demands to be loosened and fertilized. Drill down 1 to 6 inches with a cultivator - the more traffic that passes through the place, the deeper you'll need to loosen. For hefty traffic patches mix in peat moss to preserve great drainage. Once the soil has been loosened it's time to add fertilizer. Use a type and amount that suits your soil conditions and the exposure of the lawn. Rake the unfastened and fertilized soil flat.
Step 3 - Time to Distribute the Seed
With a large top quality seed that is made for the problems of your lawn (for shade, sun, slopes, etc.), spread the seed by hand. Coverage should be even but light - too much seed is bad and won't create a fuller lawn. Once the seed is distributed, casually mist the region with your hose.
Step 4 - Protective Coating
For protection and to speed up germination, spread a layer of clear polyethylene plastic sheets on top of the reseeded area. Consider down the sheets with rocks or other small, significant objects around the edge. This protective layer also acts as a humidity retainer, reducing the need to continually water for those first few days.
Step 5 - Seedlings Need Water
When you see the seedlings popping up through the soil get rid of the plastic. Or else, the protection will end up stifling growth. With the sheets off, be positive to lightly mist the soil two or three times per day until the seedlings reach a height of 1 inch. After that weekly watering is required until the grass is 3 inches tall.
Accomplish these five easy steps to appreciate a total, healthful lawn come springtime.
About the Author:
Learn more about San Jose sod. Stop by Yvonne Zimmer's site where you can find out all about sod tips and what it can do for you.
iklan ads